← Back to Search Results / Home / Search Results / Wigan Combined Fire Station Refurbishment - Carbon Works

Wigan Combined Fire Station Refurbishment - Carbon Works

Buyer THE GREATER MANCHESTER COMBINED AUTHORITY (ID: GB-SRS-supplierregistration.cabinetoffice.gov.uk/DyTN57AZ)
Awarded CF SME Friendly
Value
£250,000
Region
—
Deadline
1 Oct 2025
Status
complete
Published
—
Contract Start
1 Dec 2025
Contract End
31 Mar 2026
CPV Classification
45000000 Construction work
Description
Awarded contract via direct award under NHS Hard Facilities Management 2 Framework (SBS10166) Lot 3.3 Low Carbon Energy Infrastructure.

The carbon work at Wigan Community Fire and Ambulance Station involves the replacement of the existing gas-fired domestic hot water system with a packaged electric Air Source Heat Pump (ASHP) solution, including all ancillary equipment, housed within an external compound. Plus, the connection of the new ASHPs to the building management system (BMS) to provide…
Awarded contract via direct award under NHS Hard Facilities Management 2 Framework (SBS10166) Lot 3.3 Low Carbon Energy Infrastructure.

The carbon work at Wigan Community Fire and Ambulance Station involves the replacement of the existing gas-fired domestic hot water system with a packaged electric Air Source Heat Pump (ASHP) solution, including all ancillary equipment, housed within an external compound. Plus, the connection of the new ASHPs to the building management system (BMS) to provide control, monitoring (including energy consumption data), and analytics.
• The scheme at Wigan is expected to reduce the annual carbon emissions by circa 12.5 tonnes.
• The works are to be coordinated in a manner that minimises disruption to daily fire station operations and activities.
• The contractor will take responsibility for the design from RIBA Stage 4b and construction RIBA Stage 5.
• The formal construction programme will be issued once the formal contractor award is made.
• It is proposed that the contract will be awarded on a JCT Minor Works with Contractor's Design 2024 form of contract.

Award(s)

Supplier
Parr Facilities Management Limited
ID: GB-COH-NI632852
Awarded Value
£249,594
Award Date
17 Nov 2025
Supplier Size
large
Contract Period
1 Dec 2025 — 31 Mar 2026
This record was sourced from the Contracts Finder API. Values and dates are as published in the original notice and may change.