Manchester International Airport - Demolition Works

Buyer Kier Transportation - CP7 NWC (ID: GB-CFS-294297)
Closed Tender CF SME Friendly
Value
£100,000
Region
North West
Deadline
3 Sep 2026
Status
active
Published
27 Aug 2026
Contract Start
2 Feb 2027
Contract End
17 Apr 2028
CPV Classification
45234116 Track construction works
Description
"The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport.

The scheme is p…
"The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport.

The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP):

A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services.

The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions.

The scope areas for this package are as follows:

-Installation, maintenance and removal of rail track protection.
-Structural enabling and demolition works to an existing bridge structure.
-Removal and disposal of road and pavement surfacing, kerbs, ducts and associated materials.
-Careful removal and storage of existing coping stones and pilaster caps for potential reuse.
-Demolition of existing parapets, pilasters, precast beams, cill beams and south abutment concrete.
-Demolition and disposal of bridge structural elements in accordance with project requirements.
-Working within a rail environment with compliance to all relevant safety and possession requirements."
View on GOV.UK → Official notice
This record was sourced from the Contracts Finder API. Values and dates are as published in the original notice and may change.