Contract Start
26 Sep 2025
Contract End
25 Sep 2026
CPV Classification
31214000Switchgear
Description
The upgrading, and replacement of, the electrical infrastructure at Dungavel Custodial Establishment to enhance resilience against power failures.
To maintain operations during the construction period, temporary electrical supplies will be installed. The works include the full replacement of the Main Distribution Panel and two Sub-Distribution Panels, WK1 and WK2. Existing cables will be accommodated via a bespoke electrical panel.
The planned coordination with Scottish Power will ensure…The upgrading, and replacement of, the electrical infrastructure at Dungavel Custodial Establishment to enhance resilience against power failures.
To maintain operations during the construction period, temporary electrical supplies will be installed. The works include the full replacement of the Main Distribution Panel and two Sub-Distribution Panels, WK1 and WK2. Existing cables will be accommodated via a bespoke electrical panel.
The planned coordination with Scottish Power will ensure that the incoming power supply is suitably upgraded.